Sunday, December 28, 2008



Following a suggestion from Pam, I went out and spent $20 on materials to make a head post with Re-Bar as supports for the Lekku. Moose has the pictures I'll post them after he sends them to me.

Today I was only able to go so far as mount the floor flang to the wood base, cutting down the main support pole (water pipe) and then Moose welded the rebar to the water pipe.

Currently the top of this is at 4 ft 8 inches. I'm currently guestimating that Male Lekku need to be around 4 ft long. This is why I mounted the head so high. I will continue my research and might find this to be to long.

No comments:

Post a Comment